Select Board votes to support MBTA building lease and stretch energy code

SUDBURY — May 6, 2025 — Sudbury Select Board endorses MBTA building lease and stretch energy code on night two of Town Meeting. Meeting briefly Tuesday at Lincoln-Sudbury Regional High School, the board voted to support Article 43, a $100 nominal appropriation enabling a 99-year lease — and possible eventual purchase — of the section tool house and Sudbury station building from the MBTA for the Historical Commission's rail-trail interpretive plan. Town Manager Andy Sheehan said the arrangement would likely be "a triple net lease" leaving the town responsible for lead paint, asbestos and insurance liabilities. The board re-voted after member Lisa V. Kouchakdjian arrived late. On Article 27, the board approved a written statement drafted by member Charles G. Russo supporting adoption of the specialized stretch energy code, with Vice-Chair Radha R. Gargeya noting "all of our neighboring communities have already done it." The board recessed at 7:30 p.m. to join Town Meeting.

Keep reading with a 14-day free trial

Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Sudbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Tewksbury Post · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.