Historical Commission backs 18-month demolition delay, splits on partial-demolition track
SUDBURY — July 14, 2022 — Sudbury Historical Commission backs 18-month demolition delay but splits on whether homeowners face same wait. Consultant Peter, drafting the town's Historic Preservation Plan, recommended tripling the current six-month delay and proposed a faster track for partial demolitions. Member Diana Warren, citing review of roughly 150 municipal bylaws, opposed any two-tier system, while Marjorie Katz and Steven Greene warned 18 months for homeowner additions would be "too intimidating" and sink the article at Town Meeting. Chair Christopher Hagger sided with the skeptics. The commission also backed a CPC-funded historic structure report and collections assessment for the Hosmer House, with Diana Sebra calling the current volunteer model "an outdated mode of operation that harks back to the 1950s." Draft chapters go public ahead of the Aug. 2 meeting.
Keep reading with a 14-day free trial
Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.
A subscription gets you:
- Subscriber-only posts and full archive
- Post comments and join the community
- 24x7 access to local news