Sudbury Conservation Commission clears gas-line staging on Lincoln Meadows South

SUDBURY — January 9, 2023 — Sudbury Conservation Commission authorizes NUCO gas-line staging on Lincoln Meadows South. The commission voted unanimously on Jan. 9 to have staff draft a short-term use agreement with the utility, which plans to install roughly 400 linear feet of new gas main daily along Lincoln Road through the end of March and needs a 100-by-100-foot staging area on town conservation land. Conservation Coordinator Lori said town counsel recommended a fee, a restoration bond and secondary spill containment under vehicles; farmer Paul Cavicchio confirmed the staging will not disrupt his late-March pussy-willow harvest. Separately, members backed pulling all fee amounts out of the wetlands bylaw and into commission regulations, and removing a cap on consultant peer-review fees, ahead of a Feb. 1 deadline from the town clerk's codification consultant. The commission also issued an order of conditions for 14 tree-stump removals at 33 Barber Road and negative determinations for projects at 2 Elmwood Ave. and 29 Stone Road.

Keep reading with a 14-day free trial

Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Sudbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Tewksbury Post · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.