Historical Commission opens Sherman Bridge review, defers formal comment to November

SUDBURY — October 21, 2025 — Sudbury Historical Commission opens Sherman Bridge review and stakes out a wood-decking position. Chair Christopher Hagger told DPW Director Tina Rivard the bridge "has always been made out of wood" and questioned a proposal to swap in laminate decking with an asphalt surface, citing renderings that "look like a runway." Rivard said revised plans are due by Nov. 30 against a MassDOT-driven June 30, 2026 completion target. Wayland Historical Commission Chair Kay Gardner-Wescott read a 1992 agreement to "forever maintain the aesthetic character" of the 16-foot crossing, and preservationist Gretchen Schuler urged rumble strips over widening. The commission also voted unanimously to spend up to $500 on roughly 20 window candles for the Dec. 6–7 Hosmer House holiday open house, and approved town counsel's draft scope for an expanded MBTA license covering the railroad section house and South Sudbury train station.

Keep reading with a 14-day free trial

Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Sudbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Tewksbury Post · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.