BSC Group gathers Sudbury input on Route 20 corridor's future
Sudbury residents push sewer, sidewalks and rail-trail connections in Route 20 corridor study input.
SUDBURY -- March 20, 2025, Sudbury residents push sewer, sidewalks and rail-trail connections in Route 20 corridor study input. The Planning and Community Development Department and consultant BSC Group held a March 20 public outreach session on the five-mile Boston Post Road corridor between the Marlborough and Wayland town lines. Planning Director Adam Burney and BSC planner Adam DeSantis ran a SWOT exercise that drew residents citing eight zoning districts, four local historic districts and no municipal sewer along the MassDOT-controlled right-of-way. Speakers urged Complete Streets funding, parking-lot solar canopies, one cited a six-and-a-half-year payback on the Lincoln-Sudbury array, and reimagining strip plazas as "individual little villages." Threats raised included the high-hazard Hager Pond Dam, rising commercial rents and rail-trail crossings of Route 20. BSC will return to the Planning Board in April, the Select Board in May, and deliver a final report in late June.
Members read the rest of this story and every Sudbury meeting we cover, in full.
Become a memberAlready a member? Sign inA 30-day free trial needs a payment method. After it, your membership renews at the price shown at checkout until you cancel, which you can do anytime from your account. Subscription terms
Share this story
Know someone in Sudbury who follows town government? Share Townbrief Sudbury: they can sign up free.