Capital committee endorses $2.35M pool overhaul, defers four DPW articles

SUDBURY — February 19, 2024 — Sudbury capital committee endorses $2.35M Atkinson Pool overhaul and four other articles. The Capital Improvement Advisory Committee voted 7-0 Monday to advance five spring town meeting articles totaling more than $2.8 million, with the pool work consuming the bulk. Combined Facilities Director Sandra presented a breakdown including roughly $600,000 for a new dehumidification unit, $550,000 for roofing, $385,000 in structural work covering tile regrouting, and a $255,000 contingency, with the 40-year-old pool closed for at least two months. The committee also approved $200,000 to replace six 20-year-old DPW rooftop HVAC units during a planned roof and solar installation, $150,000 for heat pumps in Haynes Elementary corridors after staff and students slipped on condensation-soaked tile, $100,000 for the first year of a five-year classroom equipment replacement, and a DPW salt shed cover replacement. The remote meeting was disrupted when an audience member delivered racist and antisemitic invective during public comment; Chair Matthew Dallas closed public participation for the remainder of the session.

Keep reading with a 14-day free trial

Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Sudbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Tewksbury Post · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.