Capital committee deadlocks on Hosmer House envelope, backs roof and Fairbank master plan

SUDBURY — March 24, 2025 — Sudbury capital committee splits on Hosmer House envelope but unanimously backs cedar roof. The Capital Improvement Advisory Committee deadlocked 3-3 on a $615,000 Community Preservation Act request to restore the Hosmer House exterior and upgrade HVAC, with Chair Matthew Dallas, Lisa Saklad and Ark Pang opposed pending cost reconciliation and a window-scope review. The committee unanimously approved $386,000 for a cedar-shake roof on the same building, and voted 5-1 to back a $500,000 Fairbank Community Center and Haskell Field master plan that includes a $200,000 second multi-sport court and a $150,000 pavilion. On Article 24, which would replace dual $100,000/$200,000 review thresholds with a single $500,000 trigger, Thomas S. Travers warned the change would cut the committee out of early study and design work: "What scares me about the $500,000 limit is some of the projects, especially since Sandra has instituted a way where she does studies and we do design before we really propose the major projects." Combined Facilities Director Sandra Duran presented all three CPC articles.

Keep reading with a 14-day free trial

Subscribe to The Sudbury MA Post to keep reading this post and get 14 days of free access to the full post archives.

Already have an account? Sign in. Ask about this instead

A subscription gets you:

  • Subscriber-only posts and full archive
  • Post comments and join the community
  • 24x7 access to local news

Subscribe to The Sudbury MA Post

Don’t miss out on the latest issues. Sign up now to get access to the library of members-only issues.
jamie@example.com
Subscribe

More local coverage: Middlesex County News · The Tewksbury Post · The Townsend Post · The Tyngsborough Post · The Wakefield Post · The Waltham Post

Part of the Townbrief network — local government coverage for 350+ Massachusetts towns.